Chief Minister Pushkar Singh Dhami laid the foundation stone of Nandprayag-Ghat road

Spread the love

 

Pahadonkigoonj
Correspondent Chamoli- Pankaj Kathait

Chief Minister Pushkar Singh Dhami laid the foundation stone of Nandprayag-Ghat road

Chief Minister Pushkar Singh Dhami, who reached Chamoli to attend BJP’s Vijay Sankalp rally on Saturday, laid the foundation stone of one and a half lane road connecting Nandprayag to Ghat.

ध्यान से सुनियेगा औऱ11 लोगों को अवश्य शेयर कीजिएगा
11 का बड़ा महत्व खुसहाली के लिए है 11 गते मंन्गशीर्ष भगवान श्रीकृष्ण के वहाँ से जनता से विदा लेकर गुप्त सेम में गुप्तवास लिया है।

Listen carefully and must share with 11 people
The great importance of 11 is for happiness.

CM Pushkar Singh Dhami, while addressing a huge public meeting in the development block of Chamoli district on Saturday, said that it is our goal to take the development to the last person. During the program, CM inaugurated and laid the foundation stone of various development schemes worth 56 crores, 54 lakhs, 93 thousand and also announced to change the mythological name of Joshimath of Chamoli district to Jyothimath. CM Dhami said that it is our goal to take development to the last person. During the program, CM inaugurated various development schemes worth 56 crore 54 lakh 93 thousand and laid the foundation stone.
Foundation stone – 4090.78 – 40 crore 90 lakh 78 thousand)
Nandprayag-Ghat motor road one and a half lane work cost 220.68 lakhs in Karnprayag assembly constituency under CM announcement.
Under the 2-CM announcement, Nandprayag-Ghat motor road one and a half lane work cost 220.06 lakh in Tharali assembly constituency.
3-Chopta-Daduvagarh motorway construction work cost 44.96 lakhs
4-Pokhari-Karnprayag motorway improvement and asphaltization work cost 2337 lakhs.
5-Harmani-Karchuda motor road to Vinagaon-SC Basti-Harmani Talli motorway construction work cost 55.46 lakhs.
6-Pokhari-Harishankar-Chowdi-Rauta motorway to Simlasu, the motorway renovation work cost 105.29 lakhs.
7-Pokhari-Harishankar motorway improvement and asphaltization work cost 307.11 lakh.
8- Flood protection work cost 96.50 lakh in Haripur Vasti located on Faldia Nala of Dewal block.
9- Flood protection work cost 151.37 lakh on Kail river in Jain Visht village of Dewal block.
10- The cost of beautification and construction of the approach road of Chatvapipal is 118.40 lakhs.
Under the 11-CM announcement, the work cost of the Ghat main market is Rs 350.98 lakh.
Under 12-CM announcement, flood protection plan work cost 82.97 lakh in Vijaynagar (Pursadi) village of Dasholi block.
Inauguration and Foundation Stone Laying:
In the development block Nandanagar (Ghat), various development schemes of 5654.93 (56 crore 54 lakh 93 thousand) were inaugurated and foundation stone was also laid.
Among the schemes worth 1564.15 lakh (15 crore 64 lakh 15 thousand) in the launch include improvement and reconstruction work of Jilasu-Ali motorway, which cost Rs 266.41 lakh.
The cost of construction work of Hapala-Gudam-Nail motorway is Rs.346.85 lakh, steel guard motor bridge at Amsaud-Seragad and 1.82 km over Pindar river. Road work cost Rs.821.15 lakh.
Tourist Accommodation Home Tapovan inaugurated cost Rs 129.74 lakh.